work we are doing

Goha-Khelleni Section

Goha-Khelleni Section

Principle Employer

National Highways & Infrastructure Development

Name of Main Contractor

Oasis VIPL JV Infra Projects

Location

District Doda

State

Jammu & Kashmir

Budget

118.40 Cr. + GST

Project Status

Ongoing

Length

9.466 Km

Work Type

Construction of green field hill road

About Project

The Goha-Khelleni section on NH 244 in Doda district, Jammu & Kashmir, is a critical infrastructure project aimed at improving road connectivity in a challenging hilly region. Overseen by the National Highways & Infrastructure Development Corporation Ltd (NHIDCL), the project involves upgrading 9.466 km of road, including a 7.450 km stretch from Km 12+850 to Km 20+300 and a 2.016 km link road to Goha Village. This project is being executed under the EPC (Engineering, Procurement, and Construction) mode by the joint venture of Oasis VIPL and Infra Projects.

The scope includes upgrading the road to a two-lane configuration with paved shoulders to enhance traffic flow and road safety. Given the region’s difficult terrain and weather conditions, advanced construction techniques, such as bituminous concrete, dense bituminous macadam, and paver-laid road surfaces, are being utilized. The project is expected to improve connectivity within Doda, providing better access to remote areas and contributing to socio-economic development.The total contract amount is 118.40 crore INR (excluding GST). The upgraded road will benefit local residents, commuters, tourists, and goods transport, enhancing regional development and reducing travel time in the area.

Our Client’s Challenge

The National Highways & Infrastructure Development Corporation Ltd (NHIDCL) faced several challenges in implementing the Goha-Khelleni section of NH 244. The project is situated in a challenging hilly terrain that requires specialized construction methods, particularly for road alignment, material transportation, and environmental management.

Frequent rain and snow disrupted construction work.
Maintaining smooth traffic flow during construction in a busy area.
Hilly landscapes made construction and road alignment complex.
Ensuring the safety of workers and the local population due to the rugged terrain.

Our Approach And Solution

To overcome the challenges, we implemented a meticulous approach that prioritized safety, efficiency, and sustainability. Detailed surveys and planning ensured the best possible route alignment in the hilly terrain. We adopted advanced construction techniques, including the use of pavers for bituminous concrete and dense bituminous macadam to ensure long-lasting quality. Traffic management plans were put in place to minimize disruption, and environmental measures were taken to reduce the impact on the local ecosystem. Close coordination with NHIDCL, local authorities, and community stakeholders helped ensure smooth progress and timely project delivery.

What Customers Say?

“The Goha-Khelleni road upgrade project has been highly commended by the National Highways & Infrastructure Development Corporation Ltd (NHIDCL) and local authorities for its successful execution. NHIDCL officials have expressed their satisfaction with the quality and speed of the work. This project is crucial for improving connectivity in Doda district, stated an NHIDCL spokesperson. The team’s dedication to overcoming the challenging terrain while ensuring safety, quality, and timely completion is truly commendable.”
Mr. Vipul Sinha
Chief Engineering Officer
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare