work we have completed

TRG Industries Pvt. Ltd.

TRG Industries Pvt. Ltd.

Clients

National Highways and Infrastructure Development Corporation

Location

Ambah Bypass, Porsa Bypass

State

Madhya Pradesh

Budget

295.16 Cr.

Project Status

Completed

Length

78.38 Km

Sector

Roads & Highways

Sub-Sector

Rehabilitation and Upgradation

About Project

TRG Industries Pvt. Ltd. undertook the rehabilitation and up-gradation of the Morena to Porsa section of the newly declared NH-552 Ext. in Madhya Pradesh. The scope of work included the transformation of the existing two-lane flexible pavement into a two-lane road with paved shoulders, ensuring better safety and durability. The project spanned a total length of 31.48 km, specifically from Km 254+370 to Km 291+800, excluding bypasses at Km 238+940 to Km 254+370 and Km 275+850 to Km 281+800.The project featured the implementation of Conventional White Topping on roads within the cities of Morena and Ambah, with a length of 12.12 km.This was done around the areas where bypasses had been proposed to enhance the flow of traffic and reduce congestion within urban limits.

The project was completed successfully, addressing the need for modernized infrastructure to accommodate growing traffic demands in the region. The up-gradation of the road ensures improved road safety, higher load-carrying capacity, and enhanced driving comfort for commuters. The initiative is part of the larger effort to develop and upgrade National Highways in India, contributing to regional connectivity and economic development.

Our Client’s Challenge

Developing and maintaining transformation programs in finance, logistics/supply chains, information technology, training and procurement to help foster cost effectiveness and efficiency without the loss of Defense capability. Taking advantage of opportunities to help reduce costs while maintaining operational capability through partnerships.

Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Fusce elementum, eros et scelerisque hendrerit, nisi augue placerat
Integer eget viverra ex. Praesent eu luctus ex.
Nunc consectetur maximus molestie. Duis nec elementum erat.

Our Approach And Solution

The expansion includes eight additional wide-body gates, four jet bridge gates and four remote stand operation bus gates to increase capacity in the international terminal. The new restaurants and bars, retail areas, digital art and pet relief area improve the passenger experience. An iconic showpiece within the expansion is an island forest, complete with three live hemlock trees and contained within an open-air glass atrium.

What Customers Say?

“ To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including. ”

Mr. R. Ramaanujam
Director Operations and Sustainability
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare