work we have completed

Atal Residential School

Atal Residential School

Clients

UP PWD

Location

Kirawali, Agra

State

Uttar Pradesh

Budget

60.36 Cr.

Project Status

Completed

Size

2.5 Lakh sq.ft.

Sector

School

Sub-Sector

Construction

About Project

The Atal Residential School project, located in Kirawali, Agra, was commissioned by the Uttar Pradesh Public Works Department (UP PWD). The project involved the construction of a 2.5 lakh sq. ft. facility to provide quality education and accommodation for students. The contract amount for this project was 60.36 crore. The scope of work included building an administrative block, boys’ and girls’ hostels, staff quarters, and essential internal infrastructure such as roads, playgrounds, firefighting systems, and electrical work.

The school was designed to offer modern facilities to support both academic and extracurricular activities. The project has been successfully completed, providing a state-of-the-art residential school that enhances educational opportunities in the region while ensuring a safe and conducive environment for students and staff.

Our Client’s Challenge

Developing and maintaining transformation programs in finance, logistics/supply chains, information technology, training and procurement to help foster cost effectiveness and efficiency without the loss of Defense capability. Taking advantage of opportunities to help reduce costs while maintaining operational capability through partnerships.

Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Fusce elementum, eros et scelerisque hendrerit, nisi augue placerat
Integer eget viverra ex. Praesent eu luctus ex.
Nunc consectetur maximus molestie. Duis nec elementum erat.

Our Approach And Solution

The expansion includes eight additional wide-body gates, four jet bridge gates and four remote stand operation bus gates to increase capacity in the international terminal. The new restaurants and bars, retail areas, digital art and pet relief area improve the passenger experience. An iconic showpiece within the expansion is an island forest, complete with three live hemlock trees and contained within an open-air glass atrium.

What Customers Say?

“ To say that this 3 month modernization was a Herculean task would be an understatement. I remain convinced at this time, 2 weeks prior to occupancy that no other construction firm in the Bay Area could have handled such a task and pulled it off successfully. Alten collaborated with the district and design team on cost savings including. ”

Mr. R. Ramaanujam
Director Operations and Sustainability
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare